See All
Minutes
Technology Advisory Council
Meeting-
February 7, 2003
Attendees: Tony Coulson, Steve Cuddigan, Javier
Torner, Kurt Collins, Joe Scarcella, Cathe Stevenson, Jeff Hicks,
Matt Richardson, Ian Jacobs, Owen Owens, William Aguilar
The first issue addressed was this year’s computer
specifications and allocation. Quotes from Dell were passed out
addressing different configurations. The consensus was to not
include the zip drive. It was generally agreed that CDRW/DVD should
be included but the zip drive was optional. Another option
discussed regarded the internal speaker and the general agreement
was to include this $7 option. Regarding the video card, Jeff Hicks
was to get a quote for adding a VGA/DVI card that adds $20 to the
cost.
Another option that was turned down was adding a 4th
year to the service contract for $59. This option can be purchased
by the colleges along with the zip drives if needed.
The estimated cost for this year’s baseline computer
with a CDRW/DVD would be about $1,050.00. It was suggested to make
sure that this year’s baseline specs for laptops should include
wireless network cards. The observation is that within 4-5 years
laptops might be required for CSUSB students and wireless technology
should be required within the baseline specifications.
A review of the laptop quotes noted that the CDRW/DVD
needed to be included in the quote. Jeff Hicks will get amended
quotes and email them to the BATS listserv.
The committee addressed whether or not to create
baseline specs for Apple’s eMacs. The pricing is aggressively
priced at $899 for a 700mhz machine with OS X, CDRW and 128mb ram.
However, there are some technical concerns about these machines.
The other Apples are as follows: the iMacs?verbal quote is $1199
with an integral, flat 15?monitor. These machines are 800mhz with
a 60gb hard drives. The tower G4 Macs are $1299 with a 60gb hard
drive and no monitor. The technical concerns about the eMac are
being weighed because of the CSU’s budget issues.
Dell flat panel monitor prices are as follows:
15?are $374
17?are $499
19?are $649
The following colleges have reported the need to
replace the following:
CBPA
190 machines (this number needs to be verified)
COE Cathe to email BATS listserv the quantity
A&L 70 Macs
SBS
n/a
Natural
Science n/a
A request was made that after this year’s allocation
that all 350mhz machines should be removed from eligibility for BATS
funds because of the lack of future funds and the tremendous number
of machines that need to be replaced. Dr. Aguilar then requested
that all options to deal with the current inability to replace
machines be gathered together by BATS and then forwarded to Drs.
Aguilar & Fernandez. It was suggested that an alternative
consideration would be to ask Dr. Fernandez for the money to get
ride of all 350mhz machines.
Kurt Collins will get the complete number of machines
from the College of Arts & Letters. Accurate numbers are necessary
in determining how much money is needed.
CITRIX ?The ongoing Citrix discussion focused on
whether to buy more clusters or to push current cluster to its
limit. It was disclosed that Citrix is contemplating a grant to
cover the cost of licensing and software. Jeff Hick requested that
the Citrix discussion be tabled because of the potential grant.
Current Citrix licensing costs is $200 per seat. Current hardware
costs $4,000 per server. It was pointed out that the Achilles heel
to the Citrix server is storage of student’s files on a college
server. A viable option for this is a NAS storage device. There
was discussion about the need for infrastructure for NAS storage and
whether it should be decentralized or centralized.
It was determined that BATS needed to come up with a
position for centralization or decentralization. This could be a
cornerstone document. Part of decision would determine if what
system network should be. Another point was that the campus would
naturally migrate to a centralized system if that system was
reliable and cost them no money to maintain. Regardless, BATS
definitely needs to address this issue. Currently, every college is
doing “its own thing?and recreating the wheel, which is another
justification for standardization.
An obvious question for the Citrix issue is: how to
make it work like a dream? Because of this quest a subcommittee is
to create a whitepaper and assist in determining how much money
should be allocated to the Citrix solution.
A motion was made to create a committee to establish
the infrastructure needed for storage and authentication for the
campus. The members of this committee are to be Jeff Hicks, Tony
Coulson, Owen Owens, Ian Jacobs and Javier Torner. The results are
to be presented at the first BATS meeting in March. The motion was
seconded and it passed unanimously.
The meeting ended at 3:00 pm. The next meeting will
be on February 21, 2003 at 1:00 pm in the PL-002 conference room.
Back to Top
|